Skip to content

Kitchen Remodeling

Open the wall.Keep the ceiling up.Kitchen remodeling across New Jersey.

Most New Jersey kitchens were laid out for a way of living nobody does any more. We establish what the structure will actually allow, design to that, and hold the number we gave you.

  • 2–10 weeks on site
  • Permits filed and closed by us
  • Line-itemed proposal
Remodelled kitchen with pale shaker cabinetry, a stone waterfall island and warm oak flooring

Price your kitchen

Tell us where and we'll come and look. No obligation.

Communication consent

No obligation. One follow-up call, not a sequence.

01

Structural first

We find the bearing wall before we draw the island.

02

Measured, not ordered

Cabinetry drawn to your ceiling and scribed on site.

03

Templated on site

Stone cut from the room, never from the drawing.

In short

How much does a kitchen remodel cost in New Jersey, and how long does it take?

Most full kitchen renovations in New Jersey run $20,000 to $150,000 and take two to ten weeks on site, after four to six weeks of design and ordering. A refit keeping the existing layout sits at the lower end; moving a bearing wall, relocating plumbing and using custom cabinetry pushes toward the upper. Permits are required for the electrical, plumbing and structural work, and Pinnacle files them.

Typical timeline
2–10 weeks on site
Typical range
$20,000 – $150,000
Permits
Required in NJ — filed, inspected and closed by us
Delivery
Design-build — one team draws the kitchen and builds it

Overview

What a Pinnaclekitchen actually covers

A kitchen contract with us covers the drawing as well as the build: measured plans and cabinet elevations, the structural calculation for any wall we open, the township permits, demolition, framing, new electrical and plumbing rough-in, cabinetry, stone, tile, lighting, appliance integration and the inspection sign-off at the end. There is no separate designer to coordinate with, and no line called “general conditions” quietly carrying a second markup.

Scope divides fairly cleanly in two. A refit keeps the existing footprint and the existing plumbing wall — new cabinetry, new stone, new floor, new light — and moves quickly because nothing structural is disturbed. A gut takes a wall out, and in most post-war New Jersey houses that wall is carrying floor joists: a stamped structural calculation, an engineered header, temporary shoring and a framing inspection before anything closes up. You will know which of the two you have at the first visit, not after demolition.

On finishes we work in the middle and upper end of what this market actually supplies. Framed, full-overlay or inset cabinetry in painted maple or rift white oak, drawn to your ceiling height and scribed to walls that are never square. Countertops templated on site once the boxes are set — quartz, quartzite, marble or porcelain, and we will tell you plainly which of those etch in a kitchen where people cook. Backsplashes from handmade zellige to large-format porcelain, hardware in unlacquered brass, satin nickel or matte black, and ventilation ducted to the outside every time, never recirculated.

Typical timeline
2–10 weeks
Typical range
$20,000 – $150,000
Delivery
Design-build, one contract
Permits
Filed, inspected and closed by us

What we do

Eight parts of akitchen, done properly

Every kitchen we build is some combination of these, and each has a page of its own. The proposal line-items them, so you can see which choices move the number.

New steel beam carrying a wide structural opening between two rooms, with temporary shoring still in place

On site

Every opening we cut is sized by an engineer and inspected before it closes up.

That is not an upgrade line on the proposal. It is the difference between a kitchen refit and a structural alteration, and it is why our openings are not sagging in year four.

Header
Engineered steel or LVL, stamped by our engineer
Shoring
Temporary props until the new header carries the load
Sign-off
Framing inspected by the township before drywall

How a kitchen runs

From first measureto closed permit

The same four stages every Pinnacle project runs through — described here as they actually play out in a kitchen.

  1. 01

    Measure & assess

    We measure the existing kitchen, open a soffit or a ceiling bay where we need to see, and establish what is structural, where the waste stack runs and what the electrical panel can carry. You get a realistic budget band the same day.

  2. 02

    Plan & specify

    Layouts, cabinet elevations and a lighting plan, revised with you until the drawing is right. Cabinetry, stone, tile, hardware and appliances are all chosen and priced before anything is ordered — a kitchen changed after the order is a kitchen that slips.

  3. 03

    Demolish & build

    Dust wall at the threshold, kitchen out, header in, rough-in inspected. Then boxes set, stone templated, tile laid. Cabinetry is delivered into a room already finished behind it, so the crew is never standing waiting on a truck.

  4. 04

    Commission & close

    Appliances connected and run, hood airflow checked, final electrical and plumbing inspections signed off, punch list walked with you, and the permit closed out with the township.

Where we work

Kitchens we buildaround North and Central Jersey

Cabinetry lead times and township inspection schedules both vary by municipality, so knowing the town matters. These are the ones we work in most often.

Towns we work in most often

  • Ridgewood
  • Montclair
  • Millburn
  • Westfield
  • Summit
  • Chatham
  • Livingston
  • Hoboken
  • Cranford

All 21 counties

  • Bergen County

    Kitchen Remodeling in Ridgewood, Englewood, Fort Lee and across the rest of Bergen County, North Jersey.

    County seat · Hackensack

  • Essex County

    Kitchen Remodeling in Montclair, Verona, Millburn and across the rest of Essex County, North Jersey.

    County seat · Newark

  • Hudson County

    Kitchen Remodeling in Hoboken, Bayonne, Weehawken and across the rest of Hudson County, North Jersey.

    County seat · Jersey City

  • Morris County

    Kitchen Remodeling in Madison, Chatham, Parsippany and across the rest of Morris County, North Jersey.

    County seat · Morristown

  • Passaic County

    Kitchen Remodeling in Wayne, Clifton, Ringwood and across the rest of Passaic County, North Jersey.

    County seat · Paterson

  • Sussex County

    Kitchen Remodeling in Sparta, Vernon, Hopatcong and across the rest of Sussex County, North Jersey.

    County seat · Newton

  • Warren County

    Kitchen Remodeling in Phillipsburg, Hackettstown, Washington and across the rest of Warren County, North Jersey.

    County seat · Belvidere

  • Union County

    Kitchen Remodeling in Westfield, Summit, Cranford and across the rest of Union County, Central Jersey.

    County seat · Elizabeth

  • Middlesex County

    Kitchen Remodeling in Edison, Woodbridge, Metuchen and across the rest of Middlesex County, Central Jersey.

    County seat · New Brunswick

  • Somerset County

    Kitchen Remodeling in Bridgewater, Bernardsville, Basking Ridge and across the rest of Somerset County, Central Jersey.

    County seat · Somerville

  • Hunterdon County

    Kitchen Remodeling in Clinton, Lambertville, Readington and across the rest of Hunterdon County, Central Jersey.

    County seat · Flemington

  • Mercer County

    Kitchen Remodeling in Princeton, Hopewell, Lawrenceville and across the rest of Mercer County, Central Jersey.

    County seat · Trenton

  • Monmouth County

    Kitchen Remodeling in Red Bank, Rumson, Middletown and across the rest of Monmouth County, Central Jersey.

    County seat · Freehold

  • Ocean County

    Kitchen Remodeling in Point Pleasant, Brick, Lakewood and across the rest of Ocean County, South Jersey.

    County seat · Toms River

  • Burlington County

    Kitchen Remodeling in Moorestown, Medford, Mount Laurel and across the rest of Burlington County, South Jersey.

    County seat · Mount Holly

  • Camden County

    Kitchen Remodeling in Cherry Hill, Haddonfield, Collingswood and across the rest of Camden County, South Jersey.

    County seat · Camden

  • Gloucester County

    Kitchen Remodeling in Deptford, Washington Township, Glassboro and across the rest of Gloucester County, South Jersey.

    County seat · Woodbury

  • Salem County

    Kitchen Remodeling in Pennsville, Woodstown, Carneys Point and across the rest of Salem County, South Jersey.

    County seat · Salem

  • Cumberland County

    Kitchen Remodeling in Vineland, Millville, Upper Deerfield and across the rest of Cumberland County, South Jersey.

    County seat · Bridgeton

  • Atlantic County

    Kitchen Remodeling in Atlantic City, Egg Harbor, Ventnor and across the rest of Atlantic County, South Jersey.

    County seat · Mays Landing

  • Cape May County

    Kitchen Remodeling in Cape May, Ocean City, Avalon and across the rest of Cape May County, South Jersey.

    County seat · Cape May Court House

Questions

Kitchen questionswe get asked most

How much does a kitchen remodel cost in New Jersey?

Most full kitchen renovations we complete in New Jersey land between $45,000 and $150,000. A cosmetic refresh with existing layout and stock cabinetry starts near $45,000; a gut renovation that moves walls, relocates plumbing and uses custom cabinetry typically runs $95,000 and up. Every Pinnacle proposal is line-itemed, so you can see exactly which choices move the number.

How long does a kitchen renovation take?

Six to ten weeks on site for most kitchens, after a four to six week design and ordering period. Cabinetry lead time is usually the constraint, not labour — we order early and stage delivery so the crew is never waiting.

Do I need a permit to remodel a kitchen in NJ?

Yes. New Jersey requires permits for electrical, plumbing and any structural work, which covers virtually every real kitchen renovation. Pinnacle files the permits, meets the township inspectors and closes them out — it is part of the contract, not an extra.

Can I stay in my house during a kitchen remodel?

Most clients do. We build a dust barrier at the kitchen threshold, protect the path in and out, and can set up a temporary sink and fridge elsewhere in the house so you keep a working kitchen of sorts throughout.

How far ahead do kitchen cabinets need to be ordered?

Semi-custom lines are running eight to twelve weeks and full custom shops twelve to twenty, so cabinetry is ordered the moment the elevations are signed off — usually weeks before demolition. That is why we finalise the whole selection package before anything is torn out: a cabinet changed after the order resets that clock from zero.

Is it worth moving the sink and range, or should I keep the existing layout?

Moving the sink means opening the floor to reach the waste line and re-venting it, which is real money on a slab or over a finished ceiling. Moving a range is comparatively cheap — a gas line and a duct run. We price both versions of the layout so you can see what the relocation is actually buying you before you commit to it.

Free consultation

Get a written kitchen proposal

Communication consent

No-obligation walkthrough. One follow-up call.

They took out the wall between our kitchen and den and the number at the end was the number on the proposal. Our project lead texted us a photo every Friday. After two bad renovations before this one, that was the difference.

Danielle R.Ridgewood, Bergen CountyKitchen & Great Room

Start your project

Ready to build or remodel your home?

Let's create a home that fits how you actually live — and holds up for the next twenty years.