Skip to content

Whole-Home Renovation

Heating, coolingand electricalsized for the house to come.

The mistake is sizing new equipment for the house you are standing in. By the time it runs, that house will not exist.

Fully renovated open-plan living room with white oak floors and a stone fireplace surround

In detail

Heating, cooling & electrical

A gut renovation is the one opportunity to replace the electrical system rather than extend it: a new service and panel sized for how the house will actually be used, circuits run to current New Jersey code throughout, dedicated circuits where appliances need them, and GFCI and AFCI protection where the code requires it. Every run happens while the walls are open, which is the difference between a rewire and a lifetime of surface conduit and compromises.

Heating and cooling are sized from a load calculation for the finished house — insulated, air sealed, with new windows — not for the draughty one being demolished. That distinction matters: a system sized for the old envelope will be substantially oversized for the new one, and oversized equipment short-cycles, dehumidifies poorly and wears out sooner. Zoning is decided at the same time, because an open plan downstairs and bedrooms upstairs rarely want the same thermostat.

What this covers

  • New service and panel sized for the finished house
  • Full rewire to current code, with dedicated appliance circuits
  • Load calculation run against the post-renovation envelope
  • Zoning planned around how the finished house will be used
Typical timeline
3–9 months
Where
All 21 New Jersey counties

Questions

Asked most aboutheating, cooling & electrical

Do I need a new electrical panel in a whole-home renovation?

Almost always. Older panels are frequently undersized for modern demand, and many are makes or types that no longer meet code or are no longer serviceable. A gut is the moment to replace it, because the incremental cost while the walls are open is a fraction of doing it later.

Should the HVAC be sized before or after the insulation is specified?

After, always. The insulation, air sealing and window specification determine the load, so sizing equipment first means sizing it for a house that will not exist. We close the envelope specification, then run the calculation, then buy the equipment — in that order.

Free consultation

Book a feasibility visit

Communication consent

No-obligation walkthrough. One follow-up call.

Start your project

Ready to build or remodel your home?

Let's create a home that fits how you actually live — and holds up for the next twenty years.